Uus 6, Põlva
COMPREHENSIVE RECONSTRUCTION
(50% grant from SA Kredex )
The following works resulting in energy efficiency have been performed:
- Marmoroc facade
- Adding heat insulation to the roof
- Reconstruction of the heating system
- Construction of the heat recovery ventilation system
- Reconstruction of the water and sewage system
- Installation of new loggia railings and sliding glass
- Reconstruction of balconies/loggia
- Replacing doors and windows
- Renewal of the electrical system
- Reconstruction of entrance halls
- Construction of ramps and stairs
- Installation of solar panels